Product Details:
Payment & Shipping Terms:
|
Clamp Force: | 300 Ton | Lower Platen Size: | 700*800mm |
---|---|---|---|
Plunger Stroke: | 300mm | Heating Plates Distance: | 200-300mm |
Motor Capacity: | 10*2 HP(5.5KW*2) | Size: | 3360*2970*2850mm |
Max. Operating Pressure: | 20MPa | Mold Openning Stroke: | 2RT/ 3RT 4RT |
High Light: | rubber compression machine,rubber compression moulding machine |
50/60 Hz 300 Ton Vacuum Compression Medical Silicone Rubber Moulding Machine
What are the main factors affecting the vulcanization process:
1. Vulcanization temperature: If the temperature is 10 °C higher, the vulcanization time of the vulcanizing press is shortened by about half. Since the rubber is a poor thermal conductor, the vulcanization process of the product differs due to the difference in temperature of each part. In order to ensure a relatively uniform degree of vulcanization, thick rubber products generally adopt a gradual heating, low temperature and long-term vulcanization.
2, vulcanization time: This is an important part of the vulcanization process. The time is too short, the degree of vulcanization is insufficient (also known as sulfur). The time is too long, the degree of vulcanization is too high (commonly known as sulfur). The vulcanizing machine only has a suitable degree of vulcanization ( Commonly known as vulcanization), to ensure the best overall performance.
3. Sulfur dosage: The larger the dosage, the faster the vulcanization rate, the higher the degree of vulcanization that can be achieved by the vulcanizing press. The solubility of sulfur in rubber is limited, and the excessive sulfur will be precipitated from the surface of the rubber compound. Sulfur". In order to reduce the phenomenon of sulfur spraying, it is required to add sulfur at the lowest possible temperature, or at least below the melting point of sulfur. According to the requirements of rubber products, the amount of sulfur in soft rubber is generally not more than 3 %, the amount in the semi-hard rubber is generally about 20%, and the amount in the hard rubber vulcanization condition can be as high as 40% or more.
Vulcanizer Installation & Testing:
Main Technical Parameters:
Model | Unit | JC-300VF |
Clamping Force | Ton | 300 |
Upper Platen Size | mm | 680*680 |
Lower Platen Size | mm | 700*800 |
Plunger stroke | mm | 300 |
Distance of Thermo-plate | mm | 300 |
Distance of Tie bar | mm | 785*380 |
Die sinking type | 2RT-3RT-4RT-Track | |
Max Operating Pressure | Mpa | 20 |
Motor Power | hp | 10*2(7.5KW*2) |
Electric Heating Power | Kw | 24*2 |
Vacuum Pump Power | Kw | 3*2 |
Total Power | Kw | 69 |
Gross weight | Ton | 15.45 |
Dimension | mm | L3360*W2970*H2850 |
Other Vacuum Compression Machine Parameters:
Model | Unit | 200VF | 250VF | 300VF | 400VF | 500VF |
Clamping Force | Ton | 200 | 250 | 300 | 400 | 500 |
Upper Platen Size | mm | 510*510 | 600*600 | 680*680 | 800*800 | 950*950 |
Lower Platen Size | mm | 550*560 | 650*600 | 700*800 | 850*850 | 1000*1000 |
Plunger stroke | mm | 250 | 250 | 300 | 350 | 350 |
Distance of Thermo |
mm | 250 | 250 | 300 | 350 | 350 |
Distance of Tie bar | mm | 640*310 | 745*310 | 785*380 | 940*450 | 1105*475 |
Die sinking type | 2RT-3RT-4RT-Track | |||||
Max Operating |
Mpa | 20 | 20 | 20 | 20 | 20 |
Motor Power | hp | 10*2 | 10*2 | 10*2 | 15*2 | 15 |
Electric Heating |
Kw | 13.5*2 | 15.3*2 | 24*2 | 26.4*2 | 36 |
Vacuum Pump |
Kw | 3 | 3*2 | 3*2 | 3*2 | 4 |
Total Power | Kw | 45 | 51.6 | 69 | 84.8 | 49 |
Gross weight | Ton | 7.8 | 11 | 15.45 | 18 | 14.5 |
Dimension | mm | 2930*2500*2350 | 3190*2930*2495 | 3360*2970*2850 | 3650*3050*2900 | 1460*3600*3150 |
Machine Application Images:
Contact Person: info