Product Details:
Payment & Shipping Terms:
|
Clamp Force: | 400 Ton | Tie Bar Distance: | 940*450mm |
---|---|---|---|
Heater Capacity: | 26.4kw *2 | Max Operating Pressure: | 20Mpa |
Motor Capacity: | 11kw*2 | Total Capacity: | 74.8kw |
Diameter Of Cylinder: | Φ300mm | ||
High Light: | rubber vulcanizing equipment,rubber vulcanization molding machine |
400 Ton Stable Performance Hydraulic Pressure Rubber Strap Making Machine
Preparation before Operating vulcanizing machine
1. The hydraulic oil is checked before use. The height of the hydraulic oil is the height of the 2/3 in the lower frame. When the oil is insufficient, it should be added in time. It must be fine filtered before the injection of the oil is injected. Put pure 20# hydraulic oil into the injection hole of the lower seat. The height of the oil level is seen through the oil gauge bar, generally adding to the height of the 2/3 of the lower chassis.
2 Check the lubrication between the shaft and guide frame and fill it in time to maintain good lubrication.
3. The operation handle is connected to the power supply, the operation handle is moved to the vertical position, the return oil port is closed, the motor start button is pressed, the oil from the oil pump enters the oil cylinder, the driving plunger rises, when the hot plate is closed, the oil pump continues to supply oil, and the registration stop button is pressed when the oil pressure rises to the rated value (14.5MPa), so that the machine is in stop. When the machine is pressurized (i.e. timing vulcanization), when the curing time is reached, the handle is moved to make the plunger drop and open the mold.
4. The temperature control of hot plate: put the mold on the hot plate, combined with the rotation button SA1, the plate begins to heat, and when the temperature of the plate is set to preset the vulcanization temperature, the heating is stopped automatically. When the temperature is below the set point, the plate is heated automatically, and the temperature is always set.
5. The control of the action of the vulcanizer: according to the motor start button SB2, the oil pump work, the mold pressure, when the liquid pressure reaches the adjusted value for several seconds, the pressure 1~2 times, the air and the volatile gas overflow, and then press the mold, start automatically record the vulcanization time, when the pressure drops the oil pump motor to start automatic filling, reached the set up. The vulcanization time, the louder call, inform the vulcanization time has arrived, can open the mould, press the noise stop button, move the manual operation valve, make the plate drop, can carry on the next cycle.
Technical parameter:
Model | Unit | 100HF | 160HF | 200HF | 250HF |
Clamping Force | Ton | 100 | 160 | 200 | 250 |
Operation table size | mm | 400*460 | 500*520 | 550*560 | 650*600 |
Plunger stroke | mm | 200 | 250 | 250 | 250 |
Distance of | mm | 200~300 | 250~350 | 250~350 | 250~350 |
Thermo-plate | |||||
Distance of Tie bar | mm | 490*230 | 590*270 | 640*310 | 745*310 |
Die sinking type | Track-Suspension-2RT-3RT-4RT | ||||
Max Operating | Mpa | 20 | 20 | 20 | 20 |
Pressure | |||||
Motor Power | hp | 7.5*2(5.5kw*2) | 10*2(7.5kw*2) | 10*2(7.5kw*2) | 10*2(7.5kw*2) |
Electric Heating | Kw | 7.2*2 | 11.7*2 | 13.5*2 | 15.3*2 |
Power | |||||
Total Power | Kw | 25.4 | 38.4 | 42 | 45.6 |
Gross weight | Ton | 5 | 6 | 7.8 | 11 |
Dimension(L*W*H) | mm | 2500*2080*1950 | 2800*2260*1900 | 2930*2350*2050 | 3190*2780*2230 |
|
Contact Person: info