Guangzhou Ju Chuan Machinery Co., Ltd.

Quality - Oriented,  Offering Customer with Optimum Productivity and Profitability.

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Company News
Home ProductsPlate Vulcanizing Machine

40Cr Hard Chrome Columns 300 Ton Plate Hot Pressing Machine Independent Oil Circuit

Certification
China Guangzhou Ju Chuan Machinery Co., Ltd. certification
China Guangzhou Ju Chuan Machinery Co., Ltd. certification
Stable and reliable machines, professional and promptly services.

—— Rohit Gupta

Well established factory, strict quality control system

—— Rustem

professional silicone rubber injection molding machine manufacturer

—— Eddie Adirty

Prompt and professional services makes customer worry free with the machine

—— Eng. Reyad Elkashef

machine stable production is the top point to a machine, Juchuan machines make it.

—— Abbasi

Juchuan Machinery, A reliable machinery supplier in China

—— Umesh Gupta

Duarable Machine, Easy Maintenance, Professional Services

—— Khaled

Precision Injection Machine Helps To High Quality Rubber Parts, we are from Isreal

—— Amnon Hacham

Professional Silicone Rubber Injection Molding Machine Supplier With More Then 23 Years History.

—— Refaat Farouk

independent R&D capability, OEM for any specific needs.

—— Tshepo Sentsho

reliable machine quality, professional service team.

—— Mateusz Kamionka

Large Scale Enterprise, Long History, Professional Hydraulic Machinery Manufacturer.

—— Raheel

I use their machine, then I know it is good quality.

—— Mehmet Ormanci

Maszyna charakteryzuje się niezawodną jakością, długotrwałą stabilną pracą, niskim zużyciem energii i wysoką wydajnością oraz prostą obsługą.

—— Mateusz Kamionka

I'm Online Chat Now

40Cr Hard Chrome Columns 300 Ton Plate Hot Pressing Machine Independent Oil Circuit

40Cr Hard Chrome Columns 300 Ton Plate Hot Pressing Machine Independent Oil Circuit
40Cr Hard Chrome Columns 300 Ton Plate Hot Pressing Machine Independent Oil Circuit 40Cr Hard Chrome Columns 300 Ton Plate Hot Pressing Machine Independent Oil Circuit 40Cr Hard Chrome Columns 300 Ton Plate Hot Pressing Machine Independent Oil Circuit 40Cr Hard Chrome Columns 300 Ton Plate Hot Pressing Machine Independent Oil Circuit 40Cr Hard Chrome Columns 300 Ton Plate Hot Pressing Machine Independent Oil Circuit 40Cr Hard Chrome Columns 300 Ton Plate Hot Pressing Machine Independent Oil Circuit

Large Image :  40Cr Hard Chrome Columns 300 Ton Plate Hot Pressing Machine Independent Oil Circuit

Product Details:

Place of Origin: China
Brand Name: Juchuan
Certification: SGS CE ISO9001
Model Number: JC-300HF

Payment & Shipping Terms:

Minimum Order Quantity: 1 set
Price: Negotiation
Packaging Details: N/A
Delivery Time: 45 days
Supply Ability: 500 sets one year
Detailed Product Description
Clamp Force: 300 Ton Plate Size: 700x800mm
Plunger Stroke: 300mm Heating Plates Distance: 300-400mm
Tie Bar Distance: 785x380mm Machine Dimensions: 3360x2970x2250
Relay: Solid State Relay Oil Circuit: Independent Oil Circuit
High Light:

hydraulic vulcanizing machine

,

rubber vulcanization molding machine

40Cr Hard Chrome Columns 300 Ton Plate Hot Pressing Machine Independent Oil Circuit

 

Machine Corrosion Resistance:

  1. All materials of flat vulcanizing machine are selected for corrosion resistance;
  2. All depictions are referred to as anti-corrosion depictions;
  3. Use non-corrosive metals or non-metallic materials with strong corrosion resistance;
  4. the use of corrosion inhibitors in the flat vulcanizing machine.

In other aspects, it is also possible to use a single-color offset press for surfacing, thermal spraying, adhesive, electroplating, brush plating, etc. to carry out anti-corrosion treatment of the flat vulcanizing machine. After the above method can be used to avoid corrosion of the flat vulcanizing machine, and then improve the service life of the flat vulcanizing machine.

 

Working Safety Policy:

  1. Mechanical equipment must be inspected before operation, and it is strictly forbidden to operate with disease.
  2. Before the bulldozer, road roller, excavator, loader and crane are started, it is necessary to check and confirm that there are no people in the rear and the bottom before starting. In the work, a special person is responsible for the command to prevent the injury of personnel and machinery.
  3. When working in large-scale machinery, no one is allowed to perform any work within the scope of mechanical rotation.
  4. When the machine is working at night, ensure that the construction site has sufficient lighting to ensure the safety of construction workers and construction machinery. Ensure on-site traffic safety.
  5. Construction workers must wear safety helmets. Slippers and bare feet are strictly forbidden on the construction site.
  6. The earth moving operation of the earth moving vehicle at the construction site must be directed by a special person to ensure the safety of the construction personnel inside the site.
  7. All earthwork construction machinery operators must be certified to work and operate in accordance with various mechanical operating procedures.
  8. All kinds of earthmoving machinery must be inspected before entering the site, and it is not allowed to carry sick work.
  9. After the completion of the construction, the remaining materials must be cleaned up, and it is not allowed to pile up on the pavement or on the sidewalk.
  10. Set safety warning signs at the well location to prevent personnel from falling.
  11. The local fence is carried out at the construction site, which meets the requirements of civilized construction.
  12. The mechanical operation process of excavating machinery must be strictly observed when excavating machinery. When people and machines are required to cooperate, the personnel are not allowed to leave the radius of rotation of the excavator boom, and the mechanical operators are not allowed to engage in earthmoving operations.
  13. Before the bulldozer is driving, it is strictly forbidden to stand on the bracket of the track or the blade. There should be no obstacles around the machine, and the safety can be confirmed before starting.
  14. After the roller is working, it should be parked in a flat and solid place and braked. Do not park on roadsides, slopes or places that impede traffic.
  15. Before starting the grader, check the obstacles and pedestrians around the machine. After the first sound, start with the low speed, and check and confirm that the brake is sensitive and effective.
  16. Persons who cooperate with mechanical operations such as clearing, leveling, and slope repair should work outside the radius of mechanical slewing. When it is necessary to work within the radius of gyration, the machine should be stopped and braked before it can be operated.
  17. When multiple machines work together, keep a safe distance between front and rear.

Technical parameter:
 

Model Unit 300HF 400HF 500HF 1200HF
Clamping Force Ton 300 400 500 1200
Operation table size mm 700*800 850*850 1000*1000 1600*2200
Plunger stroke mm 300 300 350 350
Distance of mm 300~400 300~400 350~450 350~550
Thermo-plate
Distance of Tie bar mm 785*380 940*450 1105*475 6 posts
Die sinking type Track-Suspension-2RT-3RT-4RT        
Max Operating Mpa 20 20 20 20
Pressure
Motor Power hp 10*2(7.5kw*2) 15*2(11kw*2) 15(11kw) 25(18.5kw)
Electric Heating Kw 24*2 26.4*2 36 126
Power
Total Power Kw 63 74.8 47 144.5
Gross weight Ton 15 17 13.5 28.5
Dimension(L*W*H) mm 3360*2970*2250 3660*3050*2350 1460*3600*2380 2350*5400*2950


 

 
Product show:
40Cr Hard Chrome Columns 300 Ton Plate Hot Pressing Machine Independent Oil Circuit 040Cr Hard Chrome Columns 300 Ton Plate Hot Pressing Machine Independent Oil Circuit 1

Contact Details
Guangzhou Ju Chuan Machinery Co., Ltd.

Contact Person: info

Send your inquiry directly to us (0 / 3000)